GARDIA 7

Control System of the Sebim Pilot-Operated Safety valves for Rovno NPP, Units 1 & 2 (NT A 391/04)

On 06 of June 2005 DICS Intertrade has started the development of new Control Systems as part of Cold Overpressurization Protection Systems, delivered by WEIR, FRANCE (SEBIM) to ROVNO Nuclear Power Plant, Ukraine.

After 1 year (2007) of successful operational test of Control System GARDIA 7 of Sebim Pilot-Operated Safety Valves for Rovno NPP, Units 1 & 2 (NT A 391/04), a Final Acceptance has been conducted. As a result of this a Certificate of Final Acceptance has been signed by the NPP Management and handed for endorsement by the Regulatory Committee of Ukraine.

The systems follow the successful experience of developing and installing similar systems to units 1 to 4 of the Nuclear Power Plant Kozloduy, Bulgaria. These systems have been in operation since 1996 without a single failure. There is a patent on the structure of these systems, awarded to DICS Intertrade Ltd., published on 02 May 2000.

The experience of building and operation of such systems is unique. This is an essential feature of the modernized Nuclear reactors of NPP Kozloduy, Bulgaria. The protection systems prevent the reactor vessel from becoming intolerably brittle. It protects the reactor from cracks and also extends their operational life.

As a rule, each nuclear application is unique. It has to be proven for functional stability, robustness for the specific circumstances of the installation. Our systems are proven against seismic, vibration and electromagnetic interferences.

Another distinguishing feature of this new solution is the online process monitoring and cause and effect tracking capability. Following the regulations and the good practice of building class 1E equipment, its functionality has to be limited to the extent, which will assure the reliability target.
The highly reliable, proven and certified by NRC, USA , TMR technology Triconex, which is built in the new systems allows going beyond the functionality of the systems installed in the Nuclear Power Plant of Kozloduy, Bulgaria.
Flexible and comprehensive means of monitoring, cause/effect sequence of event displaying are implemented by class 1E certified communication line and proven Plasma Display.
A compact Object under Control Simulator on a track facilitates the integrity testing before starting after stoppage of the Systems.

Top of the page

 

Reference for this product

Top of the page


home / about us / products / news / quality assurance / download / contact

 

 

Gardia 8

Gadria 7

Gardia 6

KSPO MODERNISATION

Gardia 5 Integrated Monitoring & Control System for Oil Refinery

FOT1300 Fiber Optic Transceiver

REG-01 integrated building block of Machine Island Surveillance Operator logging System

Gardia 3 Steam Generator Wtaer Level Control System

SPDS (Gardia 4) LonWorks Based Means for Distributed Control and Monitoring

Gardia 2 Control Systems for Safety Valves

Gardia 1 Device for the Function Protection against Cold Overpressurization

KSPO Integrated supervisory Control and data Acguisition System

Programa 1024